References
SAM INDUSTRIES a.s. - Replacement of horizontal tanks at the position, production and installation of chemical sewerage, replacement of nozzles, Furmanite during the shutdown at the AVD6 plant, SLOVNAFT a.s. site, Bratislava
SAM INDUSTRIES a.s. - Pre-production, replacement of pipeline routes, replacement of heat exchangers at the position during the shutdown at the AVD6 plant, RHC site, SLOVNAFT a.s., Bratislava
SAM INDUSTRIES a.s. - Reconstruction of 3 reactors (replacement of approximately 2100 "reisers" - check valves during the shutdown at the RHC plant, SLOVNAFT a.s. site, Bratislava
SAM INDUSTRIES a.s. - Reconstruction of furnace F1 (replacement of casing, furnace radiation piping) during the shutdown at the AVD6 plant, SLOVNAFT a.s. site, Bratislava
ORLEN UNIPETROL RPA s.r.o. - Reconstruction of 4 furnaces, production, dismantling and installation of radiation pipeline routes, replacement of the superheater
Mostecká montážní a.s. - Replacement of 2 Apex units at the furnace outlet, replacement of air ducts, flue ducts at the NRL plant, ORLEN UNIPETROL RPA s.r.o. site, Litvínov, Czech Republic
Maks-D s.r.o. - Pre-assembly and assembly of air heater OV22 at US Steel, Košice
Let me know if you need further adjustments!
- Metrostav a.s. - Prague - Gabčíkovo Waterworks, Left Chamber - Rehabilitation of Outlet Channels (lining with steel pipes Ø 3750 mm)
- Mero a.s. - Nelahozeves - Reconstruction of storage tank H22 (replacement of fire protection piping, tank cooling, etc.)
- Maks-D s.r.o. - Construction of a stainless steel storage tank (550 m³ NaOH) at the SCP MONDI Ružomberok site
- Maks-D s.r.o. - Pre-assembly and installation of air heater OV23 at US Steel Košice
- PMP Montex s.r.o. - Assembly of 3 coolers (66 tons each) in stands and installation of the cooler at its position in the MONDI Štětí a.s. site, Štětí, Czech Republic
- Metrostav a.s. - Prague - Manufacturing and installation of 2 gate stands 4x4 ĽPLK, PPLK at Gabčíkovo Waterworks
- SAM-SHIPBUILDING AND MACHINERY a.s. - Reconstruction of the water treatment plant storage tank at the WWTP facility in the Slovnaft a.s. Bratislava complex
- Metrostav a.s. - Prague - Gabčíkovo Waterworks: Left chamber Lower gate, Upper gate
- Chempex HTE a.s. Brno - Prefabrication of piping for PEC F1 AD5, Slovnaft a.s. Bratislava
- Maks-D s.r.o. - Pre-assembly and assembly of an air heater at US Steel Košice
- Maks-D s.r.o. - Pre-assembly and assembly of a Ø 7500 silo in the Carmeuse Slovakia Slavec area
- SAM-SHIPBUILDING AND MACHINERY a.s. - Prefabrication of gas piping for PEC F1 AD5, Slovnaft a.s. Bratislava
- Maks-D s.r.o. - Assembly of a 500 m³ tank at Lovochemie a.s. Lovosice, Czech Republic
- ESP s.r.o. - Replacement of column plates in the Slovnaft a.s. Bratislava area
- SAM-SHIPBUILDING AND MACHINERY a.s. - Replacement of furnace F1 at AD5 in the Slovnaft a.s. Bratislava area
- Maks-D s.r.o. - Pre-assembly and assembly of off-gas piping D2200 in the Třinecké železárny area, Czech Republic
- SAM-SHIPBUILDING AND MACHINERY a.s. - Reactor repair - Replacement of the heat exchanger in the Sulfur plant at Slovnaft a.s. Bratislava
- Metrostav CZ - Water works Gabčíkovo: reconstruction of the navigation chambers (upper and lower gates + protective flap)
- MAKS-D s.r.o. - Construction of air heater no. 14. U.S. Steel Košice campus
- SAM - Replacement of furnace F1 AD5 – SLOVNAFT a.s. campus
- Třinecké Železárny - Moravia Steel - Repair of the mixed gas supply pipeline
- INTECH s.r.o. - reduction of VOC emissions to LDPE 3 – SLOVNAFT a.s.
- Čepro a.s. - Repair of Třemošná storage tank
- STREICHER SK a.s. - Instalation storage tank 2900 cubic meters - Martinská teplárenská a.s.
- CTR MERO Nelahozeves - Construction of a storage tank 125 000m3
- SAM - Replacement of EJ2 pipeline ethylene operation – areál SLOVNAFT a.s.
- SAM - Reconstruction of operation AD5 – areál SLOVNAFT a.s.
- SAM - Reconstruction of reactors - replacement of internal construction R101, R102, R103 – areál SLOVNAFT a.s.
- MAKS-D s.r.o. - Construction of air heater no. 24 – areál U. S. Steel Košice
- SAM - Construction of LDPE 4 operation – areál SLOVNAFT a.s.
- CTR MERO Nelahozeves - Construction of a storage tank 125 000m3
- SAM - Construction of a storage tank 90 000m3
- SAM - Reconstruction of operation AD5 – areál SLOVNAFT a.s.
- SY-TECH s.r.o - Installation of hot water pipes – Mlynské Nivy
- Žilinská teplárenská a.s. - Installation of hot water pipes
- Wintec s.r.o. - Production and installatio of OK shelter
- SAM - Assembly work during the stop – Kralupy nad Vltavou
- Iseng Mont Levice - Installation of storage tank 2000 cubic meters - Tepláreň Povžaská Bystrica, s.r.o
- Euromont Group - reconstruction of 4 pieces JET storage tanks
- SaM Slovnaft - construction of a storage tank of 10 000 cubic meters
- SaM - operation reconstruction AD5
- SaM - piping installation Swaats Slovnaft
- Metrostav CZ - overlap of the interspace of 4 pieces of tanks
- SaM - head pipe C2
- SaM – steam urbine installation and disconnection
- Energochemika - static projects
- SaM - KHK reconstruction of the radiation furnace
- SaM - reconstruction of the drying oven
- Gamagaz - crane track production
- Euromont Group - washing water pipes CZ
- SaM - Reconstruction VD6 Unipetrol Litvínov
- Sy-Tech - Installation of exchanger station Bratislava
- Sy-Tech - assemblyand replacement of compensators
- Messer - steel construction
- AioTech - stainless steel pipes for presses
- SaM Slovnaft - reconstruction of distillation column, installation of dryers
- Stavzip - OK gatehouse Slovnaft
- Euromont Group - construction of a storage tank 30 000 cubic meters
- SaM - Column repair D4
- Chemstroj - static calculations of tank anchoring
- Environ Servis - Assembly Philippines
- AVION Langol s.r.o. - Folding arm
- Environ Servis - tank assembly Philippines
- Montáže Přerov - assmbly of silos, Vápenka Čertovy schody
- Sy-Tech - Repplacement of pipe caps
- PMP Montex - membrane electrolysis
- SaM Slovnaft - operation reconstruction AVD6
- SaM Slovnaft - hydrogen furnace reconstruction
- Metrostav CZ - boiler reconstruction Prunéřov OK
- Sy-Tech - installation of hot water and steam pipes
- ENVIRON SERVIS - Tanks US Steel
- MONZAR - AVD 6- Revamp
- Intech s.r.o. - Green oil separator
- Intech s.r.o. - Flood protection measures
- Environ Servis - Tanks Šaľa
- METROSTAV - Bridge repair-Poľsko
- SaM, Montex - LDPE - Warehousing
- METROSTAV - Installation of the lattice structure
- V-Mont - Tank N12
- SaM - Furnance KHK shutdown
- Euromont - disassembly of tank E 18
- Environ Servis - Production of OK - service platforms
- SaM - Disassembly and assembly of column C2-AD5
- METROSTAV - OK boiler, evaporator suspension
- INTECH - Modernization
- VRU - Nitrogen
- METROSTAV - OK boiler - gentle disassembly
- METROSTAV - Installation of smoke duct
- EXCON - Welding of frames
Customer : Metrostav a.s.
- Supply and installation of storage tanks N 2602 in volume of 6,000 m3 for slope oil in Slovnaft Bratislava a.s.
Customer : SES Tlmače
- Manufacture and installation of air duct for power plant Ledvice
Customer : SaM Dunajská Streda
- Assistance on assemblage and welding works
- Assemblay work during downtime Slovnaft Bratislava
Customer : Palma Group
- Removal and installation of heating coils of tank
Customer : Intech
- Modernization of VRU
- Supply and installation of technological units
- Supply and assemblage of steel construction
Customer : SaM
- Installation of gas-steam pipes DN 500 to 1200
- Installation of steam pipes DN 80 to 350
Customer : Remeslo Stav
- Hot water connection Štrkovec assemblage ofpre-insulated pipes DN 250
- Hot water connection for Segnerova street installation of pre-insulated pipes DN 150
- Hot water connection for Segnerova street
Customer : PMP Montex
- Installation of tanks ST 13 Litvinov in the Česká Rafinérska Litvínov
Customer : Sapa profily
- Replacement and maintenance of gas regulators
Customer : Amylum Boleráz
- supply and installation of hot air heating, gas distribution for technological objects
- supply and installation –relocation of hydrant water DN 150
Customer : Intech
- Supply and installation of technological equipment in the company NooR Malli
Customer : PMP Montex
- Assembly and welding work on the gas pipeline DN 800 to 1000
Customer : SaM
- Assembly and welding work on the pipeline HRP7 in Slovnaft a.s.
Customer : Intech
- Supply and installation of green oil technology in company Slovnaft a.s.
Customer : SaM
- Absorber assembly weighing 900 tons in power plan Přunérov
Customer : SAPA Žiar nad Hronom
- Supply and installation of new technology-anodic oxidation
Customer : SES Tlmače
- Manufacture and installation of air duct for powerplant Ledvice
Customer : SaM Dunajská Streda
- Assistance assemblage and welding works
- Assemblage work during downtime Slovnaft Bratislava
Customer : Matador Púchov Continental
- Repair of pressure parts for boilers K6
Customer : Enviral Leopoldov
- Manufacture and installation of storage tanks for hexane
- Supply and installation of loading arms
- Supply and installation of technological part for filling hexane
Customer : Polata ČR
- Installation of coaling bunkers
Customer : SaM Dunajská Streda
- Repair of roof of tank 10000 m3 of Terminal Kapušany
Customer : Metrostav
- Repair of two tanks for the storage of limestone hydrate in power plant Ledvice
Customer : Amylum Boleráz
- Delivery manufacture and assemblage of steel construction of roofs for BY products
- Dismantling of steel smokestack from boilers K1 K2
Customer : Cortizo Slovakia Nová Baňa
- Supply and installation – relocation of hydrant water DN 150
Customer : SaM Dunajská Streda
- Assembly work on silo for gypsum
Customer : AMYLUM Slovakia s.r.o. Boleráz
- work on the repair and maintenance of technological equipment and lines
- production and assemblage of steel constructions
Customer : SAPA a.s. – Žiar nad Hronom
- Modification of gas pipelines
Customer : SaM Dunajská Streda
- Dismantling tanks in the area of Slovnaft a.s.
- Dismantling of pipelines in the area of Slovnaft a.s. Bratislava
- Assembly work during shutdown of AVD6 - column C7
- Manufacture and installation of tanks in the area of Slovnaft a.s.
Customer : BIS Dunaj s.r.o. Bratislava
- Assembly work during shutdown of AVD6 in area of Slovnaft a.s. Bratislava
Customer : SES a. s. TLMAČE
- Installation of distributions and OK – boiler 440 MW - Malženice
Customer : AMYLUM Slovakia s.r.o. Boleráz
- work on the repair and maintenance of technological equipment and lines
- Manufacture and installation of the tank for the storage of starch milk 500 m3
- Manufacture and installation of pipe evaporator - ducting in number 3 pieces
- Production and assembly of Blending Tank - 25 m3 - total 3 pieces
- Production and assembly of steel constructions
Customer : PALMA – TUMYS a. s.
- work on the repair and maintenance of technological equipment and lines
Customer : SAPA a.s. – Žiar nad Hronom
- ammonia pipelines
- Modification of gas pipelines
Customer : SaM Dunajská Streda
- Manufacture and assemblage of tanks 5330, 5331 in Slovnaft complex in volume 6 000 m3
- Dismantling tanks in the area Slovnaft a.s.
- Dismantling of pipelines in the area as Slovnaft a.s. Bratislava
- Installation recuperative heat exchanger in the area of Duslo a.s. Strážske
- Installation of pipe bridges in the area of Slovnaft a.s. Bratislava
Customer : INTECH s.r.o. Bratislava
- Installation of safety armatures EJ2 in Slovnaft a.s.
Customer : SES a. s. TLMAČE
- Manufacture and installation of smokestack Malženice
Customer : ENETEPS s.r.o. Topoľčany
- Installation of hot water pipes DN 500 in Bratislava
Customer : Environ Servis a.s. Vranov nad Topľou
- Production and assembly of steel construction-reconstruction of performance of rail tankers in area of Slovnaft a.s. -Terminal Kl'acany
Customer : Stroje a Mechanizmy Dunajská Streda
- Assembly of 2 tankers in Slovnaft a. s. complex Bratislava block 53, 45 in volume of 10 000 m3
Customer : Slovnaft a. s.
- Delivery and assembly of pipelines for the blower K 901 to blow through containers PP3
Customer : SAPA a.s. – Žiar nad Hronom
- Supply and installation of 2 units of cooling towers and cooling water recirculation station
Customer : AMYLUM Slovakia s. r. o. Boleráz
- Manufacture, supply and installation of steel structure RVF
- Installing the boiler LOSS 28 t / h
- Installing the filter RVF
- Work on the repair and maintenance of technological equipment and lines
- Installation of technological and energetical pipelines
Customer : Intech spol. s r.o.
- Manufacture, supply and installation of stainless steel tank for drain -300 m3
- Reconstruction of filling tanks terminal Kl'acany
- Upgrading VRU terminal Stožok
Customer : PALMA – TUMYS a. s.
- energy distribution pipelines
- assemblage of technological and energetical pipelines
- work on the repair and maintenance of technological equipment and lines
- exchange of cleavage boiler
- amplification steel structure of the roofs of buildings A, B, C, D
Customer : MEGAGAZ -Poland
- assembly of 2 tanks of volume-10 000 m3
Customer : AMYLUM Slovakia s. r. o. Boleráz
- Manufacture, supply and installation of stainless steel tank- tank for sacharification -500 m3
Customer : AMYLUM Slovakia s. r. o.
- Boleráz Replacing the air heater
- Exchange of sorter MDX
- Installation of technological and energetical pipelines
- Work on the repair and maintenance of technological equipment and lines
Customer : Intech spol. s r.o.
- Slovnaft WTP bl. 126 – Shielding of mechanical stage, flotation tanks and densification tanks
- Assemblage of bottom loading loader of tanker terminal Kl'acany
- Pipe Installation ETBE including racking arms on the terminal Bratislava
Customer : PALMA – TUMYS a. s.
- energy distribution pipes
- assemblage of technological and energetical pipelines
Customer : Intech spol. s r.o.
- Tapping PRP PS 201,203,209
Customer : Exmont s. r. o.
- Coating of deposit HRP7
Customer : PALMA – TUMYS a. s.
- energy distribution pipelines
- assembly of technological and energetical pipelines
Customer : Yugoslavia- reffinery Novy Sad
- Spherical tank
Customer : Slovnaft a. s.
- HRP7-pipelines
- branches installation
Customer : PALMA – TUMYS a. s.
- steel construction of cooling towers
Customer : PALMA – TUMYS a. s.
- Winterization - technology
Customer : Slovnaft a. s.
Pump replacement
Customer : Exmont s.r.o.
- Extending additivation MN
Customer : PALMA – TUMYS a. s.
- Desokolóna
Customer : Intech spol. s r.o.
- New connection of pipe DN-150 through new armatures from the block 52 to block 44
Customer : Intech spol. s r.o.
- Solution of VOC emissions from ČOV bl.52, 92 in area of Slovnaft a. s.
- surface treatment of pipelines and steel construction
Customer : Slovnaft a. s.
- Filtration of kerosene
- complete delivery
- Building section
- Supply of filters and pipelines
- Final inspection
Customer : PALMA – TUMYS a. s.
- pipelines for energy, steam, water, nitrogen
- assembly of technological and energetical pipelines
Customer : Yugoslavia
- Spherical tank-repair 3 pieces of spherical tanks for LPG -1000 m3
Customer : Slovnaft a. s.
- HRP7- pipelines
- branches installation
Customer : PALMA – TUMYS a. s.
- Steel construction of cooling towers
Customer : MaO a. s.
- manufacture and installation of the tank H-5104 (1200 m3)
Customer : PALMA – TUMYS a. s.
- cooling water pipelines
- assembly of technological and energetical pipelines
Customer : PALMA – TUMYS a. s.
- Manufacture and installation of storage tank 350 m3 – austenite
Customer : PALMA – TUMYS a. s.
- transesterification Stužovňa
- assembly of steel structures
- assembly of technological and energetical pipelines approx. 80 tons
Customer : PALMA – TUMYS a. s.
- installation of pipelines and equipement - nitrogen
Customer : Figaro – Bratislava
- installation of pipelines for chocolate
- repair of tanks
Customer : Slovnaft Montáže a Opravy a.s.
- Repair of laboratory for gas chromatography
- installation of pipelines
- surface treatment of pipelines
Customer : Slovnaft a.s.
- Reducing dust units on PE II
- installation of pipelines
- surface treatment of pipelines
Customer : Chladiace veže Bohunice spol. s r.o.
- Gradual reconstruction of JE - V 1
- manufacture and assemblage of steel pipe bridges, about 680 tons
Customer : Exmont s.r.o.
- VW Bratislava – new welding room
- installation of pipelines
- surface treatment of steel construction and pipelines
Customer : Montáže a.s.
- VW Bratislava – new painting room
- installation of pipelines
- surface treatment of steel construction and pipelines
Customer : Slovnaft Montáže a Opravy a.s.
- EFPA PC 21
- assemblage of pipe bridges, about 1.400 tons
- assembly of technological and energetical pipelines, approx. 1.280 tons
Customer : Slovnaft Montáže a Opravy a.s.
- general overhaul of AD5
- Removal and installation of piping
Customer : Exmont s.r.o.
- Rafinery Ubgrading Project, Raytheon a FCC MEROXY
- surface treatment of pipes and steel structures
Customer : Ligand spol. s r.o.
- construction EFPA "I. Stage, PC SRP 18 Production of sulfur "
- manufacture and assembly operation of OK operation, manufacture and assemblage of OK pipe bridge about 320 tons, including the installation of pipelines,
- complete surface treatment of steel construction and pipes
Customer : Intech spol. s r.o.
- 1 PC Revamp hydrogenation part of Ref. 4, 2, the outage
- installation of pumps and the pipes
- construction EFPA
- manufacture and installation of pipe bridges EFA 1, EFA 2, 3 EFA, EFB 1, EFH, EGF, FFI
- surface treatment of steel construction of the pipe bridges
Customer : Stavos spol. s r.o.
- distribution of fire water to Ref. 5
- installation of pipes
Customer : Slovnaft a.s.
- surface treatment and coating of storage tanks of petroleum products
- comprehensive solution on coating of storage tanks with a capacity of 25,000 and 75,000 m³
- complete solution of surface treatment on spherical tanks
Customer : Transpetrol a.s.
- Reconstruction of storage tanks PS 4 Tupá
- complete solution of surface treatment of storage tanks